Date: 2007-2008
Project Description:The subject of
this project is construction of plant for blast furnace
slag granulation. The envisaged annual capacity of the
plant is granulation of 530,000 tons of liquid slag.
The plant for granulation of blast furnace slag is an
addition made within the scope of the modernization
project for the existing Blast Furnace, and is also
part of the technological entity for production of crude
iron.
The technology of slag processing through granulation
starts by effusion of slag from the Blast Furnace. The
melted (liquid) slag at the temperature of 1300°C
– 1550°C is led into granulation chamber through
a channel system (with an internal refractorylining).
A direct contact between pressurized water stream and
melted liquid slag takes place in the granulation chamber.
Due to rapid cooling and the impact of water pressure,
the melted slag is granulated into small, 12 mm particles
which form a hydro mixture with water, and then are
transported to the granulated slag basin through the
channel. In the granulated slag basin the granulated
slag cools down, and the slag is taken out of the basin
with a crane equipped with a grab bucket and transferred
to draining bins where the slag is relieved from the
water surplus through draining. The drained slag is
extracted from draining bins onto the conveyors system
to the loading bin via brimming hopper. From the loading
bin the slag is gravitationally extracted and batched
into the mobile bin scale where it is weighed and then
gravitationally loaded into railway wagons or trucks
which ends the process of producing granulated slag.
Charachteristics:
Direct Slag Granulation System is consist of following
parts:
Granulation chamber
Granulation chamber is built as a steel metal form where
the melted liquid slag is treated by water jets. The
vapor that is developed during the contact of melted
slag and water in the granulation chamber is drained
by steam pipeline inside of which the granulation chamber
is situated
Steam pipeline The steam pipeline
is build as a cylindrical steel metal structure through
which the vapor developed in the granulation chamber
is brought outside of the plant, and the top of the
steam pipeline is located above the roof of the hall.
Steam pipeline diameter in the beginning D= 4,5 m
Steam pipeline diameter in the end D= 3,5 m
Steam pipeline height L= 46 m
Granulation basin
Basin length L= 30 m
Basin width B= 14 m
Basin depth H= 4 m
Two Bridge cranes with grab buckets
Lifting capacity Q= 10 t
Draining bins
Volume of one segment V= 100 m3
Belt conveyor T1
L= 29.4 m
Conveyor capacity Q= 150 t/h
Belt conveyor T2
L= 95.5 m
Lifting height H= 23,6 m
Conveyor capacity Q= 150 t/h
Loading bin
Total volume of loading bins V= 300 m3
Height of loading bin structure H= 24 m
Automotive bin scale
Volume of scale bin V= 19 m3
Carrying capacity of the balance cart N= 300 kN
Wagon positioner
Tensile force of the cart V= 8000 kg
Maximum stroke of the cart L= 24 m
Water Distribution System
The direct slag granulation system also includes the
distribution of all waters used in slag granulation
process.
Scope of Work:
»Basic and detail design of Direct Slag Granulation
System
» Manufacturing of equipment
»QA During Manufacturing
»Erection and commissioning
» Start-Up
» Testing
» Training of Production and Maintenance personnel
|